14. If you are bump testing an instrument or instruments with 2 special sensors,
you will then be prompted to change the GAS 2 cylinder. The pumps on the
instruments will stop.
If you are bump testing an instrument or instruments in the first bank of 5
docking stations (numbered 1-5), the following screen will appear. Be sure
to change the calibration cylinder connected to the GAS 2 manifold of the
first bank of 5 docking stations.
If you are bump testing an instrument or instruments in the second bank of
5 docking stations (numbered 6-10), the following screen will appear. Be
sure to change the calibration cylinder connected to the GAS 2 manifold of
the second bank of 5 docking stations.
If you are bump testing instruments of the same configuration in both 5-
docking station banks, the following screen will appear. Be sure to change
the calibration cylinder connected to the GAS 2 manifold of each 5-docking
station bank. You will need to change 2 cylinders.
When you have changed the GAS 2 cylinder, click OK. The bump test will
continue and the second GAS 2 calibration gas will be applied to the
instrument(s) for the duration specified in the Gas Exposure Time parameter in
the Configuration Window.